Q34. Does your state DOT currently have quantifiable performance targets for any of the following indicators? |
Yes | No | Not applicable | Don't know | Number of respondents |
|
---|---|---|---|---|---|
a. Road surface or pavement conditions (e.g., international roughness index) | 47 | 4 | 0 | 0 | 51 |
b. Bridge conditions (e.g., numbers or percentages of structurally deficient bridges in state) | 48 | 3 | 0 | 0 | 51 |
c. Vehicle congestion levels (e.g., travel times, delays, vehicle throughput) | 35 | 14 | 1 | 0 | 50 |
d. Transit congestion levels (e.g., travel times, delays, person throughput, capacity) | 10 | 29 | 7 | 4 | 50 |
e. Truck freight mobility (e.g., truck freight trips, volume of goods) | 13 | 32 | 4 | 1 | 50 |
f. Rail freight mobility (e.g., rail freight trips, volume of goods) | 11 | 30 | 6 | 2 | 49 |
g. Intermodal connectivity of state transportation network (e.g., increased accessibility, numbers and types of intermodal connections) | 12 | 34 | 3 | 1 | 50 |
h. Progress made implementing long-range statewide transportation plan (e.g., number or percentage of projects from long-range plan advancing to the STIP) | 11 | 24 | 14 | 1 | 50 |
i. Progress made implementing the STIP (e.g., STIP funds obligated; number or percentage of projects from the STIP advancing to construction) | 38 | 10 | 1 | 1 | 50 |
j. Timeliness of project delivery (e.g., average time required to complete projects, or number or percentage of projects completed on schedule) | 38 | 7 | 1 | 4 | 50 |
k. Project costs (e.g., number or percentage of projects completed within budget) | 34 | 12 | 1 | 3 | 50 |
l. Safety measures (e.g., numbers of hazards, crashes, or fatalities) | 49 | 0 | 1 | 1 | 51 |
m. Surface transportation-related emissions or energy consumption | 20 | 26 | 2 | 2 | 50 |
n. Progress made by state in meeting transportation goals established in long-range plan | 22 | 24 | 2 | 1 | 49 |
o. Other | 3 | 3 | 0 | 3 | 9 |